Skip to main content
5PLACES
LEFT
FOUNDING MANUFACTURER PROGRAMMEProof Sprint · £2,950–£4,500
INVESTIGATION ROI CALCULATOR

Value the time spent searching.
Then measure the proof.

Estimate the investigation-preparation capacity currently tied up in manual evidence searches. The calculator is transparent, editable and deliberately excludes unproven defect, scrap and recurrence claims.

YOUR CURRENT INVESTIGATION WORKLOAD

Build a transparent planning estimate.

Use team-wide monthly investigation volume. The number of engineers provides context and is not multiplied into the result, preventing double counting.

ILLUSTRATIVE ANNUAL VIEW
Modeled capacity value£23,760

432 skilled hours potentially returned to Quality and Engineering work.

30% time reduction£11,880216 hours · planning scenario
50% time reduction£19,800360 hours · planning scenario
70% time reduction£27,720504 hours · planning scenario
Current search effort720 hours£39,600 annual cost
Repeat investigations72 per yearContext only; no recurrence reduction is assumed
Proof Sprint payback1.5 months–2.3 monthsAgainst the £2,950–£4,500 founding range
Team context4 engineers240 investigations per year
Planning estimate—not a guaranteed saving.

The model values reduced evidence-search time only. It does not claim fewer defects, less scrap, reduced recurrence or cashable headcount savings. A Proof Sprint establishes a measured baseline.

Replace assumptions
with a measured baseline.

A Founding Manufacturer Proof Sprint fixes the start and stop points, then compares preparation time and retrieval quality on an approved historical dataset.

Assess My Quality Memory